Example of a cement grinding plant with used / refurbished ball mill and
partial new auxiliary equipment
Weigh feeder for clinker, gypsum and additives (Original place of installation)
The gear box was refurbished and equipped with new gear-wheels in 2003.
Last refurbishment of mill main motor 03/2009
Second main drive as spare part
Mill main motor with auxiliary drive (Original place of installation)
Mill main drive (Original place of installation)
Mill intermediate diaphragm
Liner 1st compartment
Inlet wall lining system (Original place of installation)
Back side of intermediate diaphragm lining system 2nd compartment
Bucket elevator with feeding air slide (Original place of installation)
Air separator (Original place of installation)
Process fan (Original place of installation)
Process fans (after dismantling)
Wear protection of the separator (after dismantling)
Cage wheel of the separator (after dismantling)
Middle part of the separator (after dismantling)
Process fan (after refurbishing)
Seperator casing (after refurbishing)
3D drawing of the separator
3D drawing of mill and separator arrangement
Set of air slide (Original place of installation)
Flow control gate (Original place of installation)