A group of investors assigned Intercem with building a raw material storage area, a 100 tph cement grinding plant, two steel cement silos, a packing plant with an 8-connection rotopacker, plus HGV loading stations in Mozambique. The engineering work was provided by Intercem and the components were delivered exclusively from Europe. With the exception of the foundation work, all the deliveries and services were performed by Intercem.