At the end of 2015, an additional contract was placed by KCCL. Due to the fact that the humidity content of the raw material Pozzolan appeared much higher than initially expected and specified. For this reason it was decided to order a Pozzolan-Dryer as well as a further storage for primary crushing and drying of the raw material at Intercem. Construction and installation of these additional assets have meanwhile been finished and the plant including the Pozzolan-Dryer – with a throughput of 40 tph – was commissioned. So a further semi-turnkey order could be successfully completed – as usual according to Intercem’s motto: “Fast, fair, flexible”.